Application of Analytical Hierarchy Process (AHP) Method in Determining Dike Construction for Handling Tidal Flood

Henny Pratiwi Adi

Abstract


Tambak Lorok in Semarang is one of the areas that often undergoes tidal floods. The construction of dam and dike infrastructure is an effort to overcome tidal floods. As one part of the flood control system, the dike has an important role. The construction projects requires an alternative selection method of dike construction in order to function optimally. This research aims to determine the order of priority criteria and alternative construction of dikes. The data were obtained through questionnaires to experts in the field of dike construction. The aspects of criteria used to analyze alternative dike construction are : functions and benefits, site conditions, costs and construction implementation.  The dike construction alternatives include a Concrete Sheet Pile (CSP), Parapet Wall with reinforced Corrugated Concrete Sheet Pile/CCSP and landfill with Geotube Components. The questionnaire were processed using the Analytical Hierarchy Process (AHP) method with the Expert Choice v.11 application. The results showed consistency ratio (CR) of 5%, which means that research data were consistent and could be accounted for. Based on weighting in pairwise comparisons, the priority criteria in selecting type of dike construction are : functions and benefits (33%), site conditions (32%), cost (18%) and construction implementation (17%) The priority alternative dike construction is reinforced Corrugated Concrete Sheet Pile/CCSP (39.7%), landfill with geotube components (3.28%) and Cylindrical Concrete Piles (CSP) (27.5%). Dike construction with reinforced CCSP is a top priority in the handling of tidal floods in the Tambak Lorok.


Keywords


tidal flood; dike; criteria; alternative

Full Text:

PDF


DOI: http://dx.doi.org/10.30659/jacee.3.1.17-26

Refbacks

  • There are currently no refbacks.


JACEE (Journal of Advanced Civil and Environmental Engineering)
is published by Fakultas Teknik Universitas Islam Sultan Agung, Indonesia, in collaboration with Federation Internationale du Beton (fib).
Jl. Raya Kaligawe Km.4, PO BOX 1054/SM Semarang 50112
Website: https://ft.unissula.ac.id/
Email: jacee@unissula.ac.id

ISSN: 2599-3356 (Online)
DOI : 10.30659/jacee

This work is licensed under a Creative Commons Attribution 4.0 International License

Get a feed by atom here, RSS2 here and OAI Links here

slot88dana4d

slot gacor

Fenomena Scatter Hitam Kenapa Banyak Yang Mencarinya Bongkar Rahasia Scatter Hitam Auto Hadiah Besar Trik Ampuh Memancing Scatter Hitam Dengan Mudah Scatter Hitam Muncul Tanda Hoki Sedang Memihak Cara Jitu Menangkap Scatter Hitam Dengan Tepat Kenapa Scatter Hitam Disebut Kunci Kemenangan Besar Prediksi Scatter Hitam Hari Ini Wajib Coba Scatter Hitam Sudah Turun Saatnya Panennya Besar Fakta Menarik Tentang Scatter Hitam Yang Harus Diketahui Sensasi Scatter Hitam Apa Benar Bisa Bikin Saldo Meledak Sensasi Baru Mahjong Ways 2 Dengan Trik Menang Terbukti Bongkar Rahasia Mahjong Ways 2 Bisa Jadi Jalan Ninja Auto Profit Main Mahjong Ways 2 Dengan Cara Unik Dijamin Seru Dan Menguntungkan Metode Baru Di Mahjong Ways 2 Yang Bisa Bikin Pengguna Untung Besar Temukan Cara Main Mahjong Ways 2 Yang Bikin Saldo Naik Cepat Petir Zeus Di Gates Of Olympus Bisa Jadi Kunci Kejutan Besar Temukan Trik Rahasia Gates Of Olympus Untuk Hasil Maksimal Modus Baru Di Gates Of Olympus Bisa Bikin Hasil Lebih Mantap Cara Main Gates Of Olympus Yang Bisa Bikin Hasil Lebih Epic Fenomena Gates Of Olympus Dengan Polanya Yang Lagi Viral